Belli D, Mazzanti F
Requirements analysis ProB LNT Formal Methods UML UMC
One of the goals of the 4SECURail project has been to demonstrate the benefits, limits, and costs of introducing formal meth- ods in the system requirements definition process. This has been done, on an experimental basis, by applying a specific set of tools and method- ologies to a case study from the railway sector. The paper describes the approach adopted in the project and some considerations resulting from the experience.
@inbook{oai:it.cnr:prodotti:471855,
title = {A case study in formal analysis of system requirements},
author = {Belli D and Mazzanti F},
doi = {10.1007/978-3-031-26236-4_14},
year = {2023}
}